Why it matters

For many waterfront lots, the RPA is the single biggest limit on what you can do with the land closest to the water. It can affect:

Where the law comes from

Resource Protection Areas (RPAs)

Under 9VAC25-830-80(B), an RPA includes:

  1. Tidal wetlands;
  2. Nontidal wetlands connected by surface flow and contiguous to tidal wetlands or water bodies with perennial flow;
  3. Tidal shores;
  4. Other lands the locality finds necessary to protect state waters; and
  5. A buffer area not less than 100 feet wide adjacent to and landward of those features and along both sides of any water body with perennial flow.

The regulation states that the full buffer is designated as the landward part of the RPA even where there are permitted uses, encroachments, or permitted clearing.

Resource Management Areas (RMAs)

Under 9VAC25-830-90, a locality must provide a Resource Management Area contiguous to the entire inland boundary of the RPA. The RMA covers land that, if improperly used or developed, could cause significant water quality degradation or diminish the RPA's function. Localities are to consider including floodplains; highly erodible soils, including steep slopes; highly permeable soils; nontidal wetlands not already in the RPA; and other land the locality considers necessary to protect state waters.

An RMA is not a no-build buffer. Work in the RMA is less restricted than work in the RPA, but a local permit is still normally required for land disturbance there, and stormwater, erosion and sediment control, and septic standards apply.

What you can and cannot do in an RPA

The development criteria for RPAs are in 9VAC25-830-140. New development in the RPA is limited to water-dependent facilities and certain other categories, and the 100-foot buffer is to be kept in, or restored to, vegetation that protects water quality. The full buffer remains part of the RPA even where some uses or clearing are permitted.

Vegetation removal in the buffer. Under 9VAC25-830-140, existing vegetation may be removed only with the local government's approval, and only to provide for reasonable sight lines, access paths, general woodlot management, and certain best management practices, such as those that prevent upland erosion and concentrated stormwater flows.

Bigger projects. A pool, a larger house footprint, a new driveway, or other new pavement is generally not a permitted RPA use. Those projects generally need a local exception, not routine approval, but the criteria treat some categories (such as certain roads and driveways, water-dependent facilities, and some older-lot encroachments) differently, so not every project follows the same approval route.

Older lots and existing structures may qualify for special treatment under the state criteria and local rules. Any clearing in the buffer, including sight-line pruning or an access path, still needs local approval under 9VAC25-830-140.

Examples of projects that commonly raise RPA questions:

Exceptions

If a project does not fit within the criteria, the owner needs an exception under 9VAC25-830-150. Exceptions are acted on by the local governing body, the planning commission, or a committee the locality designates, after notice and a hearing. An addition or modification to an existing legal principal structure may be handled administratively without a hearing; that path does not cover accessory structures, so a pool is not in it. Approvals may require mitigation, such as replanting the buffer elsewhere on the lot.

Enforcement

Unpermitted clearing or construction in an RPA can lead to stop-work orders, required restoration, and civil penalties under local ordinances adopted under Va. Code § 62.1-44.15:74.

How the Act fits with other waterfront permits

The Act regulates land. Work in tidal wetlands, on state-owned bottom, or on coastal primary sand dunes is handled through the Joint Permit Application process involving VMRC, the local wetlands board, DEQ, and the U.S. Army Corps of Engineers. A single project, such as a living shoreline with a new pier and a path through the buffer, may need both an RPA review and a Joint Permit Application. See our guide to the Joint Permit Application.

For buyers and sellers

Under the Virginia Residential Property Disclosure Act, the seller typically chooses to deliver to the buyer a statement that the seller makes no representation about the condition of the property. That places the burden of investigating the condition of the property on the buyer, to include the question of whether there is an RPA that would restrict development.

Before you buy:

See our waterfront buyer due-diligence checklist.

Frequently Asked Questions

What is a Resource Protection Area?

It is land a locality designates under the Chesapeake Bay Preservation Act, including tidal wetlands, tidal shores, certain nontidal wetlands, and a buffer not less than 100 feet wide landward of those features and along both sides of perennial streams.

How wide is the RPA buffer?

Under 9VAC25-830-80, not less than 100 feet, measured landward from the RPA features and along both sides of perennial streams.

Can I cut trees in the RPA for a water view?

Only with local approval. Pruning is generally preferred to removal. Tree removal for sight lines requires local approval and appropriate replacement planting under the applicable rules. Preserve and prune mature trees where feasible; replacement with trees may be required. Clearing without approval can lead to penalties and replanting requirements.

Does the seller have to tell me if a lot is in an RPA?

In most cases the answer is “no”. That puts the investigation on you, but a seller who affirmatively misstates or conceals a fact may be liable, even if he or she elects to make no disclosures.

Does the Act apply to my county?

The Act states that it applies in “Tidewater” but then defines “Tidewater” expansively to include 46 counties and cities. Generally speaking, the Act covers the counties and cities in Virginia located east of Interstate 95. Check with your county or city planning office to confirm whether your property is subject to the Act.

Can I rebuild my house if it is already in the buffer?

Local rules often address existing structures and older lots, but expanding the footprint generally requires a local exception. Check before you design.

Talk to Jim Lang

Every waterfront property is different, and the answer often turns on a survey, a deed, or a permit file. Waterfront Law Group helps Virginia buyers, sellers, owners, and agents sort out waterfront questions before they become expensive disputes. Talk to Jim Lang about your property.

This page provides general information about Virginia law and is not legal advice. Reading it does not create an attorney-client relationship. Laws change and every property is different; consult a licensed Virginia attorney about your situation.